Noise and disruption on Levels 3 and 4 (7 – 13 Dec 2026)
CTC Phase 2 deliveries (7–13 Dec 2026) may cause noise and disruption in the Level 4 hallway (Lift 4–CTC) and the main staircase (Levels 3–4). Please follow on-site signs and staff instructions.
Read More